One workshop.One core intelligence.
Every station in the workshop logs what it does and sends it to one core. The core intelligence collects each line, keeps the record and issues the JobPack that ships with the part.
Walk the stationsLine drawing of the workshop in isometric: the technical office, the cold store, the cutting table, the lay-up bench with the tablet, the vacuum pump, the walk-in oven and the inspection bench. From each one a line rises, turns and runs level into the core intelligence, which issues the JobPack.
Representative data rates
It starts asa drawing
Technical office
The part is drawn in CAD, and its ply book and written cure profile are set before any material leaves the cold store.
Logged The drawing, the ply book and the cure profile are the plan every later line is checked against.
Into the JobPack Drawing, ply book, cure profile
The lot isthe first line
Cold store
Prepreg is held cold on the roll until it is cut.
Logged Each roll carries its lot number, read when the roll comes out.
Into the JobPack Material lot
| Lot | g/m² | Arrived | In store, 1 to 22 Jul | Life left | Out |
|---|---|---|---|---|---|
| L-2605-097 | 210 | 18 May | 293 d | 3 Jul | |
| L-2607-118 | 210 | 6 Jul | 323 d | 21 Jul | |
| L-2607-121 | 416 | 8 Jul | 330 d | 21 Jul | |
| L-2607-126 | 416 | 15 Jul | 337 d | In store |
Cut to theply book
Cutting table
Each ply is cut to its outline from the ply book and nested on the roll.
Logged Every piece is logged against the roll it came from.
Into the JobPack Ply outlines and lots
Laid and logged,ply by ply
Lay-up bench
Plies go onto the mould one at a time, in the order of the ply book.
Logged Each ply is logged as it goes down: its lot, its orientation and the minute it was laid.
Into the JobPack Every ply, its orientation and time
Tablet
At the bench, where the operator records the work as it is done.
Logged The operator logs the mould and each ply on it, so every entry carries who made it and on which mould.
Into the JobPack Operator, mould, ply log
| Ply | Role | Fabric | g/m² | Orientation | Lot | Logged |
|---|---|---|---|---|---|---|
| 1 | Surface | 2x2 twill 3k | 210 | 0/90 | L-2607-118 | 09:12 |
| 2 | Structural | 2x2 twill 6k | 416 | ±45 | L-2607-121 | 09:27 |
| 3 | Structural | 2x2 twill 6k | 416 | 0/90 | L-2607-121 | 09:41 |
| 4 | Structural | 2x2 twill 6k | 416 | ±45 | L-2607-121 | 09:56 |
| 5 | Structural | 2x2 twill 6k | 416 | 0/90 | L-2607-121 | 10:08 |
| 6 | Surface | 2x2 twill 3k | 210 | 0/90 | L-2607-118 | 10:21 |
The cure,as it happened
Vacuum pump
Holds the bag down on the tool through the whole cycle.
Logged The vacuum under the bag, read for the whole cycle: 10 mbar or better.
Into the JobPack Vacuum over time
Walk-in oven
Runs the written profile: 70 °C for 4 h, 120 °C for 1 h, natural cool.
Logged Air and tool temperature, from thermocouples on the tool, for the whole cycle.
Into the JobPack Oven air, tool temperature
- Elapsed
- 7:15
- Tool
- 55.6 °C
- Air
- 48.4 °C
- Vacuum
- 6.7 mbar
- Phase
- Cool
| Phase | Rate or time | Setpoint |
|---|---|---|
| Ramp | Ramp 1.0 °C/min | 70 °C |
| Hold | 4:00 | 70 °C |
| Ramp | Ramp 2.0 °C/min | 120 °C |
| Hold | 1:00 | 120 °C |
| Cool | 1:00 | Natural cool |
Checked whereit matters
Inspection
The part is checked with a 3D scanner and a caliper, and its clear coat is read at twelve points.
Logged Dimensions and the twelve readings are logged against the 40 to 50 µm band: the last lines before release.
Into the JobPack Dimensions, clear-coat readings
12 of 12 readings inside 40 to 50 µm
| Point 1 | 44.1 µm |
|---|---|
| Point 2 | 46.3 µm |
| Point 3 | 42.8 µm |
| Point 4 | 45.0 µm |
| Point 5 | 47.6 µm |
| Point 6 | 43.5 µm |
| Point 7 | 41.9 µm |
| Point 8 | 45.8 µm |
| Point 9 | 48.2 µm |
| Point 10 | 44.7 µm |
| Point 11 | 43.1 µm |
| Point 12 | 46.9 µm |
Clear-coat thickness · representative readings
One record leaveswith the part
The core intelligence collects what every station sends, keeps one record per part and issues it as the JobPack, which ships with the component.
JobPackCQ-26-0114
- Drawing
- Part drawing, ply book, cure profile
- Technical office
- Material
- XC110 · lots L-2607-118, L-2607-121
- Cold store
- Kit
- 6 plies cut, each traced to its roll
- Cutting table
- Mould
- M-014 · EL160 epoxy tooling
- Tablet
- Lay-up
- 6 plies, each logged · OP-03
- Lay-up bench
- Vacuum
- ≤ 10 mbar for the whole cycle
- Vacuum pump
- Cure
- 70 °C 4:00 · 120 °C 1:00 · natural cool
- Walk-in oven
- Inspection
- Clear coat 12 of 12 in band · dimensions checked
- Inspection
Work with us.